Project Name: Solar Power Plant
Location: Grobiņa Parish, Dienvidkurzemes Municipality, Latvia
Year of Implementation: 2025
Description:
Design and construction of a 0.6 MW solar power plant, providing a complete technical solution and grid connection. The project was implemented by integrating the new solar plant into a unified system with an existing cogeneration plant, ensuring efficient and stable electricity generation.
Project Name: Energy Storage System (BESS) for a Solar Park
Location: Nīca Parish, Dienvidkurzemes Municipality, Latvia
Year of Implementation: 2025
Description:
Design and construction of a 4 MW Battery Energy Storage System (BESS), including full integration and connection to the solar park infrastructure. The solution is intended to ensure stable power balancing and efficient storage and utilization of generated electricity.
Project Name: Solar Power Plant
Location: Nīca Parish, Dienvidkurzemes Municipality, Latvia
Year of Implementation: 2024
Description:
Design and construction of a 4 MW solar power plant on 5.3 hectares of land unsuitable for agricultural use. The project included the installation of 6,864 solar modules, construction of 175 tonnes of metal support structures, pile foundations driven to a depth of 4.5 meters, and the installation of more than 24 km of cabling. The power plant was commissioned with a full grid connection, ensuring stable and efficient utility-scale energy generation.
SIA "OMS" was founded in Liepaja, 1991 and is one of the largest electric installation workers on the Kurzeme side. OMS is a licensed company for electrical installations. Company Construction Code Reg. No.: 0365-R. The main activity of OMS is the design, assembly, operation and repair of electrical installations, measurements and adjustments of the inspection.